Answer

How long does a garden design and build take?

Design is usually a few weeks; the build runs from weeks to several months by scale.

In short

The design phase is usually a few weeks, depending on the complexity and the survey. The build then runs from a couple of weeks for a focused project to several months for a full garden with structures, water or significant groundwork. We set out a realistic programme after the site survey so you know what to expect.

Arrange a consultation

Send a few photographs and a sentence about the site. We will reply personally.